The July 28, 2016 hailstorm that smashed Colorado Springs wreaked havoc on the airport’s original canopies and walkways. The second phase is to replace the old, wide-cell, polycarbonate product with new Nano-Cell® technology. We do not need to replace the aluminum framing, just switch out the glazing with new Pentaglas panels.

Phase Two deals with the replacement of the hail damaged canopies and walkways along the exterior of the terminal.  You can see in the pictures the differences between the old damaged panels and the new Pentaglas® Nano-Cell® Glazing.