Standing Seam Polycarbonate Skylight Installed On Top Conservatek Structure

Final stage of the project is to install the U-Lite panels on top of the space frame

Mullions have been installed on top of the space frame structure in both directions and battens are being installed on top of the mullions. Some polycarbonate panels have been installed. Next post will show those details.The space frame is ready to accept the CPI Daylighting U-Lite panels.

Leave a Reply

Your email address will not be published. Required fields are marked *